CBS About CBS Community Tzedakah Education Calendar Worship Service Times Contact CBS Membership
 

Home > About CBS > New Building Project

ABOUT CBS

Overview
Meet the Rabbi
Board of Directors
> Building Project
Newsletter
History of CBS
Heritage Park
Contact CBS

Building ProjectBuilding Project

Congregation Beth Shalom is in the process of constructing a new building, located on a 13 acre site at the corner of California Avenue and Chase Street in Corona. CBS will be on 2 acres, Corona United Methodist Church (CUMC) will be 5.5 acres, with the remaining 5.5 acres developed as a park.

Co-location allows both facilities to enjoy one parking lot and maximizes the land usage.

map

Floor Plan
The new building has been designed to be flexible and to meet the congregational needs well into the future.

Floor Plan

Building Process
The plan is to develop the site in 2 phases. Phase 1 will be approximately 4500 sq. ft. and consist of the sanctuary/ social hall, classrooms, kitchen, study and library. The sanctuary/social hall will accommodate about 175 people. Phase 1 will also include a 1600 sq. ft. outdoor deck.

Phase 1

Phase 2 will add an 11,000 sq. ft. building to the site -- a new sanctuary that extends to a separate social hall for large events.

Phase 2Phase 2


Building Drawings
Interested in the details of our plans? The drawings are now available to download
in PDF format. If you do not have Adobe Acrobat Reader, please click here.

Landscape (5.84MB PDF)
Architecture
Mechanical
Electrical
Plumbing
Grading
Site Improvements
Steel Plans

Back to Top

 

Let them make Me a sanctuary, that I may dwell among them.    Exodus 25:8


Donate to the Building Fund
Your donation can make the difference! Donate today.